Controlled Environments Construction, Inc.
Manteca, California

10,000 Square Foot Deep Freezer Insulated Panel Warehouse for Carl’s Jr. Restaurants
California State University, Fullerton Parking Structure
Fullerton, California

136 Precast Panels...Casting completed in 25 days.
Riverwalk III
Bakersfield, California

Medical Building.  Two stories, plus basement.  93 Precast Panels, 60,000 Square Foot.  Erection in March 2004, lasting 3 weeks from start to finish.
Los Angeles International Airport Runway 25L
Los Angeles, California

Contech Stormwater Solutions Vortechs Model 5000 modified to withstand airway traffic.  Constructed in 6 seperate sections and installed in 1 day.
Mohawk Ranch Business Center
Phoenix, Arizona

90 Metal Stud Thin Structural Wall Panels at 20,000 Square Feet.  Erection completed in 10 working days.
Memorial Medical Center
Bakersfield, California

396 Precast Panels and Columns at 80,000 Square Feet.  Included Ornate Architectural Detailed Panels.  Average 10' x 34'.
Lompoc Federal Prison
Lompoc, California

72 Cells, 19 Plenums, 22 Corridors, 105 Precast Wall Panels, 14 Columns, 14 Beams, 201 Hollow Core, 13 Flat by Station.
Michelson Street Parking Garage
Irvine, California

107 Precast Panels with reveals.
Montecito Vista Communities
San Jose, California

1,040 Feet of 8'H Drystack Style StoneTree Fencing.
1,570 Feet of 6'H Drystack Style StoneTree Fencing.
UNLV Science, Engineering & Technology Building
Las Vegas, Nevada

21,500 square feet of colored concrete metal stud crete wall panels manufactured and installed.
UNLV Advanced Dental Education Building
Las Vegas, Nevada

122 Colored Precast Concrete Panels, manufactured and installed.
Riverlakes Galleria Shopping Center
Bakersfield, California

Reinforced Precast Concrete Double Box Culvert.
 